We have a highly experienced team of professional project engineers and managers who have successfully completed numerous projects for leading industrial organizations. Our commitment to delivering innovative solutions and achieving satisfactory results has led to continuous growth, with more and more projects being entrusted to us.
Our work has been widely recognized and appreciated across the globe. This reputation also serves as a catalyst for the success of our training institute, where we maintain the same high standards of excellence. We never compromise on the quality of our projects, nor in the delivery of our training programs.
Let's take a look at some of our key projects, where our expertise and capabilities are clearly demonstrated.

Location: Baltic Sea - Poland Control Systems : Emerson DeltaV DCS / SIS V13.3 Client: Fores Engineering, Italy Final Client: LOTOS PETROBALTIC. Project description: The project involves the conversion of a mobile jack-up drilling structure, built in 1980, to an offshore platform for oil production, to be permanently installed in the extraction zone.
1.Supply the Control & Automation Manpower resource to the site for NAQ PIII Offshore production platform Engineering, Configuration, Site Commissioning, and Start-up. 2. Site changes as per site requirements, commissioning activities, third Party Communication, Pre-commissioning. 3.Site Commissioning, Graphics Development, Logic Configuration, Onsite modification, Loop checking DeltaV DCS V13.3. Graphics and Control Modules configuration as per Documents and P&IDs.
Supply the Control & Automation Manpower resource to the Bulk Oil Tanker commissioning work in China with IFix SCADA V5.0 modification, Dynamo development, Commissioning with Kongrsberg DCS, OPC Tag create to get the date from DCS to IFix SCADA.
1. Accusamus et iusto odio dignissimos ducimus qui blanSupply the Control & Automation Manpower resource to the site for Commissioning and Start-up. 2. Site changes as per site requirements, commissioning activities, third Party Communication, Pre-commissioning. 3. Site Commissioning, Graphics Development, Logic Configuration, Onsite modification, Loop checking DeltaV DCS V11.3. Graphics and Control Modules configuration as per Documents and P&IDs.ditiis praesentium voluptatum deleniti atque corrupti quos dolores et quas molestias excepturi sint occaecati cupiditate non provident
1. Supply the Control & Automation Manpower resource to the site for Commissioning and Start-up. 2. Site changes as per site requirements, commissioning activities, Third Party Communications, Pre-commissioning. 3. Site Commissioning, Graphics Development, Logic Configuration, Onsite modification, Loop checking DeltaV DCS V11.3. Graphics and Control Modules configuration as per Documents and P&IDs.
1. Commissioning the DeltaV DCS System in Concentrator and Raw Water Systems. 2. Review/Redesign of Complex Loops/Logic diagrams/Control Configuration in Concentrator / Raw Water System. 3.Site Commissioning, Graphics Development, Logic Configuration, Onsite modification, Loop checking DeltaV DCS V11.3. Third Party Profibus / Modbus communication with ABB, Siemens, Genset, Bore pump.
1. Commissioning the DeltaV DCS System in Kizomba A and Kizomba B FPSO in Angola block 15 offshore Platform. 2. Site Commissioning, Loop Checking, Graphics Development, Logic Configuration, Onsite modification in DeltaV DCS V10.3. Third Party communication through Profibus, Modbus, etc....
1. Commissioning all conversion units including, Hydrocrackers, FCC, Alkylation, Gas plant, Hydrogenation, etc. 2. Review/Redesign of Complex Loops/Logic diagrams/Control Configuration/Compressor Performance/Ant surge control systems. Conducting Group Discussions to explain and validate control configuration of complex loops before performing FAT. (Working with Invensys/EPC teams at Singapore FAT stage), Training Of Operation Engineers/Operators on Control Systems.
DeltaV DCS New Project scope at Green Field Project at Erbil Refinery(20000 BPSD), Kurdistan, Iraq. Excel Automation Solutions involved in the following activities: 1. Basic Engineering, FEED, Panel Design, Database, Graphics, and Control Modules configuration as per Documents and P&IDs. 2. Site activities – Modbus & Third party system communication, loop checking, site supporting, commissioning support. 3. Safety Instrumented Systems (SIS) modules commissioned and configuration. 4. Site changes as per customer requirements. 5. System setup and power up. 6. Maintenance and operation support.